screening of e cavated material scope of work

SECTION 2 EARTHWORKS - UNDP Procurement

2.1 Scope of Work This section covers trenching and backfilling work and shall include the necessary clearing, grubbing and preparation of the site; removal and disposal of all debris; excavation and trenching as required; the handling, storage, transportation and disposal of all excavated material; all

Excavation and Backfilling of Soil - Work Sequence and Procedure

Excavation and backfilling of soil is a very important part of construction process, and care must be taken while excavation in safety perspective. Different soil layers may be encountered while excavation, dewatering may be needed sometimes.

SCOPE OF WORK EXCAVATION & SHORING ALDER STREET PROJECT 1.1 .

SCOPE OF WORK EXCAVATION & SHORING ALDER STREET PROJECT 1.1 GENERAL A. WORK The term “Work” includes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents.

screening of excavated material scope of work in australia

The scope of work (SOW) under TO 0009 includes the removal actions at AOC-55.. The screening of the excavated material will produce two piles of earth: Lucas - Total Contract Solutions We also work extensively with.

ATTACHMENT # 1 SCOPE OF WORK CONSTRUCTION OF REINFORCED .

2. The Contractor shall cut level and remove excavated material. The Contractor shall dispose of excavated material. B. NEW WORK 1. The Contractor shall construct a reinforced concrete slab of 6.70 meters (22 feet) long by 3.04 meters (10 feet) wide by 0.15 meter (6 inches) thick with reinforcement of 5/8”

Work Procedure of Excavation at Construction Site

Quality checks such as recording ground level and marking of reference points should be done. Excavation is the process of moving earth, rock or other materials with tools, equipment or explosives. It also includes trenching, wall shafts, tunnelling and underground. It is the preliminary activity of the construction project.

CHAPTER 2 EARTHWORK 2.1 SCOPE: 2.2 GENERAL

2.1 SCOPE: Earthwork shall consist of all necessary site clearing and grubbing, excavation and backfill for structures and trenches, site grading, grassing and restoration, as well as related work as shown on the plans and as specified herein. 2.2 GENERAL: